Dhaka MRT LINE – 5 (North)

Japanese ODA
Jun 2020 - Ongoing
Description
The Northern Route is one of the branches of the approved MRT Line 5 of Dhaka Metro Rail; the other one being the Southern Route. The construction of the Northern Route started in 4 November 2023 and is scheduled to commence operation by 2028.
Main Project Features
• Total Track Length: 20 Km (Underground & Elevated).
• Underground Section: 09 Stations (13.5 Km Track length)
• Elevated Section: 05 Stations (6.5 Km Track length)
Services
| Field Investigations | Detailed Design | Tender Assitance |
| Construction Supervision | Transport Planning | EIA |
| SIA | LAP | RAP |